Recently Completed Projects

Recently Completed Projects

Client

Project Name

Energy Development Corporation

• Chemical Cleaning and Hot Oil Flushing of Lube Oil System of Unit-3 of TGPP

• Chemical Cleaning & Flushing of Turbine Oil System of Mt. Apo Geothermal Power Plant 2

• Mahanagdong Geothermal Power Plant Lube Oil Tank Cleaning

• Mt. Apo Geothermal Power Plant Cooling Tower, Main Condenser and Gas Cooler Cleaning by Hydrojetting and Hydroblasting

Air Liquide Philippines Inc.

• Chemical Cleaning of Process and Buried Pipeline

• Chemical Cleaning by Soaking Method of 4" ø Schedule 40 Carbon Steel Pipes

• Chemical Cleaning by Soaking Method of 6" Schedule 40 Carbon Steel Pipes

Weir Group c/o Bacman Geothermal Power Plant

• Main Oil Tank Cleaning

• Lube Oil System Flushing / Filtering

Keppel Batangas Shipyard

• Hull 100 OK TEDI-Lube Oil

• Hull 100 OK TEDI

• Hull 100 OK TEDI

• Hull 100 OK TEDI

• Hull 100 OK TEDI

• Hull 102 BRAS SETE - 1

• Hull 100 OK TEDI

Cotabato Sugar Central Co. Inc. Cleaning/Hydrojetting of Tubes of Evaporators and Heaters during Milling Season at COSUCECO
James Hardie Phil. Inc. Pipeline Cleaning
JG Summit Petrochemical Corp. Internal Cleaning of PP Reactor and Gas Cycle Line by Hydroblasting
Bechtel Overseas Corporation GLNG Plant Project: Chemical Cleaning of Air-Cooled Heat Exchangers
Rubicon Offshore International Supply of Material, Fabrication, and Onboard Installaton of Emergency Generator damper access door and IG Drain and COW line

 

Comment

Ongoing Projects

Recently Completed Projects

News & Events

Gallery

Careers @ Cesco